How much horsepower do I need?
Start with the most demanding job and implement. Share the crop, terrain, soil conditions and implement type and width. For a PTO-driven implement, check the required PTO power and speed against the tractor’s specifications. For pulling work, compare drawbar power where published and discuss tyres, ballast and traction with the supplier.
Penn State Extension equipment selection guide
Will my existing implements fit?
Send the implement model and a photo of its data plate. Confirm the three-point hitch category, PTO speed and shaft type, hydraulic flow and outlets, and lift capacity at the required point. Verify the actual configuration on the quotation. Equipment can vary within a model series.
How do I compare two used tractors?
Compare quotes for machines that can do the same work. Look at condition, indicated hours, service records, likely repairs and spare-parts availability alongside the price. Include inspection, freight and any repairs before putting the tractor to work.
What should I check before buying a used tractor?
Ask for photos of the machine and serial plate, a dated cold-start video, the hour-meter reading, available service records and a list of known faults. Ask a qualified inspector to check the engine, transmission, steering, brakes, hydraulics, PTO, tyres, leaks and signs of structural repairs. Agree on the inspection scope and how defects will be handled before shipment.
What is included in an FOB quote?
Confirm the amount, currency and exact loading port. Ask for the wording “FOB [named port of shipment], Incoterms® 2020.” Under FOB, the seller handles export clearance and delivers the tractor on board at that port, where risk passes to the buyer. Budget separately for ocean freight, any insurance you arrange, destination charges, import duties and taxes. If the carrier takes delivery at a container terminal before loading, ask whether FCA at a named place fits that handover.
What documents should I confirm before paying?
Ask your licensed destination customs broker to verify import eligibility and required documents for the exact tractor, including applicable requirements for used machinery. Confirm who provides the commercial invoice, packing list, transport document and any required origin, condition or conformity documents. Match the model and serial number across the paperwork where applicable.
How are packing and shipping arranged?
Ask for packed dimensions and gross weight. A freight forwarder can use these to compare container, roll-on/roll-off and other options for your route. Confirm whether wheels or attachments will be removed, who reassembles them at destination, how the machine will be secured, and whether loading photos will be provided.
What should be in the order and warranty terms?
Before sending a deposit, review the supplier’s legal name, payment beneficiary, configuration, price, inspection acceptance, balance due date and delivery terms in writing. Confirm warranty coverage by part, duration and territory, and who pays for labour and parts shipping. Ask about availability and lead times for common service parts.
What information should I send for a quote?
Send the destination country and port, quantity, intended work, target horsepower, acceptable condition and hours, and desired delivery date. Include any preferred model and essential options, such as four-wheel drive, a cab or a particular PTO speed.